Laserfiche WebLink
9255517888 Line RECV - 2-2013 517 <br /> ®GETTair-RYAN INC. . Job# 20-592983 <br /> DEC 12 2013 <br /> SWRCB,January 2002 Page 4 of 5 <br /> 6.p�nvc suMr TEENIVIROTH NMENETAL <br /> NT <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(specify) <br /> Test Equi went Used: Incon Equipment Resolution: 0.0001 <br /> Sum # 87 Sum # Diesel Sum # W.Oil Summ# <br /> Sum Diameter: 37" 40" 55" <br /> Sump Depth: 33.5" 35" 421- <br /> Sump <br /> 2"Sum Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 17" 17" 17" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 10" 12" 10" <br /> Electrical Penetration: =above <br /> Condition of sum rior to testing: Good Good <br /> Portion of Sum Tested(1) 2"Above piping 2"above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No . Yes No - Yes No NA <br /> roduct and water)?* <br /> Turbine shutdown nse timeN/A N/A <br /> Is system programmed for fail-safe Y� No Yes No Yes No Yes No NA <br /> shutdown?* I ' <br /> Was fail-safe verified to be yys No Yes No Yes No Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10min 10min lomin <br /> test: <br /> Test Start Time: 10:40 10:07 12:19 <br /> Initial Reading Ri): 3.9937 4.3988 3.2344 <br /> Test End Time: 10:55 10:22 12:34 <br /> Final Reading(Rf) 3.9930 43985 3.2326 <br /> Test duration: 15min 15min 15min <br /> Change in Reading Rf-Ri: -0.0007 -0.0003 -0.0016 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Results: I X Pass Fail X Pass - Fail I X Pass .Fail Pass -Fail> <br /> Was sensor removed for tesrin ? No NA No NA No NA Yes No NA <br /> pro <br /> Was sensor perly replaced end 7y , <br /> No Yes No Yes No Yes No NA <br /> verified functional atter testing? <br /> Comments-(include information on repairs made prior to resting,and recommendfollou upforfailed tesis) <br /> (])If the entire depth o£the sump is not tested,specify how much was tested.If the answer m any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entiresump must be tested.(See SWRCB LG-160) <br /> I <br />