My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2009 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:59:06 PM
Creation date
11/8/2018 9:59:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2015
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2009 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2009 - 2015
QuestysRecordDate
8/2/2018 4:41:39 PM
QuestysRecordID
3952362
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9255517888 Line 1 14:14:06 12-12-2013 4/7 <br /> ®Girwir-RYAN INC. • '*JRECQ �4A3DD <br /> SWRCB,January 2002 <br /> age 3 0>'S <br /> 5.SECONDARY PIPE TESTING <br /> D'C 12 2013 <br /> Test Method Developed By: Tank Manufacturer Industry Standard fI H p ��L <br /> Other(specify) <br /> SALT <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(specify) <br /> Test Equipment Used: Pressure Gau a Equipment Resolution: .5 PST <br /> Piping Run# 1 Piping Run# 2 Piping Run# 37 Piping Run# 4 <br /> Pi in Material: Fiberglass FiberglassFiberglass Pibeiglass <br /> Piping Manufacturer: Smith Smith Ameron Ameron <br /> Piping Diameter: 3" 3" 3" 3- <br /> Length of Pi <br /> "Len thofPi in Run: 50' S0' 15' 30" <br /> Product Stored: Reg Diesel NIA W.Oil <br /> Method and location of Test boot to test boot Test boot to test boot 'fest boot to test boot Test Boot to test boot <br /> Piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10min 10min 10min 10min <br /> starting test: <br /> Test Start Time: 9:15 9:15 11:30 1130 <br /> Initial Reading(Ri): 5psi 5ps1 5psi 5ps1 <br /> Test End Time: 10:15 10:15 12:30 12:30 <br /> Final Reading R 5psi 5psi SPA 5psi <br /> Test duration: 1hr 1hr 1hr lhr <br /> Chane in Reading(Rf-Ri: 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> Test Results: I'X Pass Fail X. Pass Fail X Pass Fail X Pass. Fail. <br /> Comments-(inchade information on repairs made prior to lestinX,and recommendfollow-up./by failed tests) <br /> 1-87 Product to disp <br /> 2-Diesel to dip <br /> 3-W.Oil to vent <br /> 4-W.OiI Product <br />
The URL can be used to link to this page
Your browser does not support the video tag.