Laserfiche WebLink
9255517888 Line 1 14:14:06 12-12-2013 4/7 <br /> ®Girwir-RYAN INC. • '*JRECQ �4A3DD <br /> SWRCB,January 2002 <br /> age 3 0>'S <br /> 5.SECONDARY PIPE TESTING <br /> D'C 12 2013 <br /> Test Method Developed By: Tank Manufacturer Industry Standard fI H p ��L <br /> Other(specify) <br /> SALT <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(specify) <br /> Test Equipment Used: Pressure Gau a Equipment Resolution: .5 PST <br /> Piping Run# 1 Piping Run# 2 Piping Run# 37 Piping Run# 4 <br /> Pi in Material: Fiberglass FiberglassFiberglass Pibeiglass <br /> Piping Manufacturer: Smith Smith Ameron Ameron <br /> Piping Diameter: 3" 3" 3" 3- <br /> Length of Pi <br /> "Len thofPi in Run: 50' S0' 15' 30" <br /> Product Stored: Reg Diesel NIA W.Oil <br /> Method and location of Test boot to test boot Test boot to test boot 'fest boot to test boot Test Boot to test boot <br /> Piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10min 10min 10min 10min <br /> starting test: <br /> Test Start Time: 9:15 9:15 11:30 1130 <br /> Initial Reading(Ri): 5psi 5ps1 5psi 5ps1 <br /> Test End Time: 10:15 10:15 12:30 12:30 <br /> Final Reading R 5psi 5psi SPA 5psi <br /> Test duration: 1hr 1hr 1hr lhr <br /> Chane in Reading(Rf-Ri: 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> Test Results: I'X Pass Fail X. Pass Fail X Pass Fail X Pass. Fail. <br /> Comments-(inchade information on repairs made prior to lestinX,and recommendfollow-up./by failed tests) <br /> 1-87 Product to disp <br /> 2-Diesel to dip <br /> 3-W.Oil to vent <br /> 4-W.OiI Product <br />