My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:56:03 PM
Creation date
11/8/2018 9:59:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/23/2018 8:37:33 PM
QuestysRecordID
3946151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Don Mukai -2- January 23, 2013 <br /> Bravo, since dimensions of the new dispenser and the existing UDC determine the size <br /> and angle of the sloped weirs. <br /> Review Process of the CONV-82000 <br /> Pursuant to California Code of Regulations (CCR), Title 23, § 2636(g)(3), we have <br /> reviewed the application to determine whether the system adequately protects the soil <br /> and beneficial uses of groundwater. During the review process the State Water Board <br /> received and reviewed the following documents: Dispenser Conversion Frame, Model <br /> CONY-B2000 product literature; State Registered Professional Engineer Approval letter; <br /> Conversion Frame Specifications, and Bravo Conversion Frame Installation/Inspection <br /> Manual. A California registered Professional Engineer has reviewed the Bravo catalog <br /> sheet with specifications and the B2000 Conversion Frame Installation Instructions and <br /> has concluded that the frame is acceptable for adapting an existing installed UDC to a <br /> new dispenser (See Enclosure 2). <br /> Conditions of Approval for the CONV-62000 <br /> Based on the Professional Engineer's review and the documentation you've submitted, <br /> we are granting approval of the CONV-82000 under the following conditions: <br /> 1. This model comes in several sizes in order to accommodate various dimensions <br /> of UDC and dispenser. Schematics of all existing and future sizes for the CONV- <br /> B2000 shall be made available upon request of the State Water Board. <br /> 2. Materials and procedures employed in the construction of the CONY-B2000 shall <br /> remain the same as the materials that were indicated in the documents reviewed <br /> by the State Water Board. <br /> 3. Installation procedures in no way supersede local, State, and federal regulations. <br /> Qualified individuals must obey all local laws, regulations, and requirements <br /> when installing the CONV-132000. <br /> 4. The procedures (CONY-62000 Conversion Frame Installation/inspection Manual <br /> dated August 21, 2012) submitted in the approval process must be followed in <br /> their entirety. Any variations in the installation procedures must be reviewed and <br /> approved by the State Water Board. <br /> 5. Only qualified individuals meeting the requirements of CCR, Title 23, section <br /> 2715(h), including training and certification by the manufacturer (S. Bravo <br /> Systems, Inc.), are allowed to install this product. <br /> 6. Final authority to approve the use of the CONV-132000 in a particular jurisdiction <br /> rests with the local regulatory agency. The local agency may require <br /> preapproval, permit, and/or inspection of the installation by either local agency <br /> staff or a registered professional engineer (special inspector)who has education <br /> and experience with'underground storage tank system installations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.