My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:56:03 PM
Creation date
11/8/2018 9:59:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/23/2018 8:37:33 PM
QuestysRecordID
3946151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This system provides a permanent and fuel-compatible solution to situations where electrical <br /> conduit lines that are locked in concrete just outside of existing UDC's will interfere with the <br /> standard installation of a CONY B2000 conversion frame. In this event certain areas of the angled <br /> drainage panels must be cut out or cut open to allow the existing conduit lines and their components <br /> to penetrate through the frame. This CON V-Retrofit-Plate product maintains the integrity of the <br /> angled drainage panels by extending and/or re-sealing them back tofactory specifications. This <br /> maintains the intended function: which is to direct and drain any fluids that leak from within the <br /> hydraulic cabinet down into the existing UDC below. <br /> Upon review of the manufacturing procedures,employment of the materials used in the fabrication <br /> of the CONY Retrofit-Plateproduct and the manufacturer's installation guidelines, it is my <br /> conclusion that sound design and engineering of this product will meet or exceed the secondary <br /> containment requirements of the California State Approved UDSCCS CONVVB2000 Conversion <br /> Frame system as concerns corrosion resistance and material compatibility of all motor vehicle fuels, <br /> alternative fuels or their additives currently, used by petroleum marketers today.I approve the above <br /> engineering specifications .for the Bravo CONV-Retrofit-plate product along with the Bravo <br /> Adhesive,Retrofit Epoxy Kit. <br /> Please contact me with any questions at 323-888-4136. <br /> o�,gpf+ESSyp�. <br /> Sincerely, <br /> 3 . <br /> :3 27 <br /> Don K.Mukai , <br /> Mechanical Engineer cpsCyq�� �' - <br /> OF CA1.4 <br /> 3RP-CONY-Retrofit-Plate PAGE 2 oft <br />
The URL can be used to link to this page
Your browser does not support the video tag.