My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:56:03 PM
Creation date
11/8/2018 9:59:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/23/2018 8:37:33 PM
QuestysRecordID
3946151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tait shall have the appropriate fire extinguisher equipment on the job prior to the start of <br /> the project. No cutting torch, open flame, or spark producing equipment shall be used on <br /> the tank or piping at any time. Any source of ignition shall be at least 50 feet away from <br /> the excavation site. <br /> A properly calibrated flammable/combustible gas and oxygen analyzer is required on the <br /> job site prior to excavation or removal. Calibration of the meter must be within the last <br /> three months. <br /> All electrical lines, piping, and like items known to be associated with the tank shall be <br /> isolated or disconnected. <br /> If at anytime during the Removal of AST, the lower explosive limit of the atmosphere <br /> around the tank exceeds 25 percent, all work will cease and proper mitigation procedures <br /> initiated. <br /> CONFINED SPACE <br /> DO NOT ENTER TANK SUMP (S) FOR ANY REASON. Appropriate control <br /> measures, such as fencing and confined space supervision, harness &tripod must be <br /> employed prior to any worker entering into the tanks sumps. <br /> All tank sumps and some excavations are considered permit required confined spaces <br /> until they are removed, and after the new sumps are installed and the concrete tank slab <br /> has been poured. Monitoring and all other confined space procedures must be followed <br /> when entering the sumps. THERE ARE NO EXCEPTIONS <br /> SOIL REMOVAL, DISPOSAL AND SAMPLING <br /> Any and all soil removal and disposal is the sole responsibility of the client, and all soil <br /> samples will be analyzed per clients' requirements. <br /> LOCKOUT AND TAGOUT PROCEDURES (ENERGY ISOLATION) <br /> Lock-out procedures must be followed during the cleaning, servicing, or adjusting of <br /> machinery or electrical equipment. LOTO procedures shall be implemented as required <br /> by applicable Federal, State, or Property Owner rules and regulations. <br /> FALL PREVENTION <br /> 100% fall protection shall be employed for all work at heights. Fall protection shall <br /> include scaffolds, aerial lifts, and personnel hoists. Also guardrails, toe boards, and other <br /> primary systems may be implemented. In addition, provisions for secondary fall <br /> protection (full-body harness and fall arrest systems) shall be used for employees <br /> working or traveling more than six (6) feet above a lower level and are exposed to an <br /> imminent fall hazard (this includes working conditions hat present hazards such as <br /> leading edge, open holes, and skylights on building rooftops and/or eI r elevated <br /> towers/structures). All fall protection devices used shall be manufactured in accordance - <br /> iUI— Y42017 <br /> E: `.ro . _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.