Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: <br /> ❑X Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ �'cs ❑ No_ Has all input��i ring been inspected for proper entry and termination,including testing for ground faults? <br /> E:1Yes F-1 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 4 <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> ❑ 1'es ❑No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑No* Were all probes reinstalled properly? <br /> ❑Ye1.s ❑No* Were all items on the equipment manufacturer's maintenance checklist compl to <br /> In the Section 11,below describe how andwhen these deficiencies were orwilI be corrected. <br /> G.Line Leak Detectors(I.LD): ❑ Check this box if LLDs are not installed. ENVIRONMENTAL HEALTH <br /> DrIz:PARTr1 ENT <br /> Complete the following checklist: <br /> 0 1"cs ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> ❑N/A all that apply) Simulated leak rate: ❑X 3g.p.h.; ❑0.1 g.p.h;❑0.2g.p.h. <br /> 0 1'cs ❑No* Were all LLDs confirmed operational and accurate within reUulatoryrequircmrnts? <br /> ❑ 1"cs ❑ No* Was the testin rpparatus properl� cnlihratcd" <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> 0 Yes ❑No* For electronic LLDs, does the turbine automatically shut off ifthe LLD detects a leak? <br /> ❑N/A <br /> ❑X Yes ❑No* For electronic LLDtu <br /> LLDs, does the rbine am <br /> Liu shut off if any portion of the monitoring system is disabled or <br /> ElN/A disconnected? <br /> q❑Yes ❑No* For electronic LLDs, does the turbine autoniatically shut off ifany portion of the monitoring system malfunctions or <br /> ❑X N/A tai is a test? <br /> ❑Yes ❑No* For electronic LLDs,have all accessible w iri ng connections been visually inspected? <br /> 0 N/A <br /> Z Yes ❑No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or wig be corrected. <br /> H. Comments: <br />