My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:56:03 PM
Creation date
11/8/2018 9:59:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/23/2018 8:37:33 PM
QuestysRecordID
3946151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: <br /> ❑X Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ �'cs ❑ No_ Has all input��i ring been inspected for proper entry and termination,including testing for ground faults? <br /> E:1Yes F-1 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 4 <br /> ❑Yes ❑No* Was accuracy of system product level readings tested? <br /> ❑ 1'es ❑No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑No* Were all probes reinstalled properly? <br /> ❑Ye1.s ❑No* Were all items on the equipment manufacturer's maintenance checklist compl to <br /> In the Section 11,below describe how andwhen these deficiencies were orwilI be corrected. <br /> G.Line Leak Detectors(I.LD): ❑ Check this box if LLDs are not installed. ENVIRONMENTAL HEALTH <br /> DrIz:PARTr1 ENT <br /> Complete the following checklist: <br /> 0 1"cs ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check <br /> ❑N/A all that apply) Simulated leak rate: ❑X 3g.p.h.; ❑0.1 g.p.h;❑0.2g.p.h. <br /> 0 1'cs ❑No* Were all LLDs confirmed operational and accurate within reUulatoryrequircmrnts? <br /> ❑ 1"cs ❑ No* Was the testin rpparatus properl� cnlihratcd" <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> 0 Yes ❑No* For electronic LLDs, does the turbine automatically shut off ifthe LLD detects a leak? <br /> ❑N/A <br /> ❑X Yes ❑No* For electronic LLDtu <br /> LLDs, does the rbine am <br /> Liu shut off if any portion of the monitoring system is disabled or <br /> ElN/A disconnected? <br /> q❑Yes ❑No* For electronic LLDs, does the turbine autoniatically shut off ifany portion of the monitoring system malfunctions or <br /> ❑X N/A tai is a test? <br /> ❑Yes ❑No* For electronic LLDs,have all accessible w iri ng connections been visually inspected? <br /> 0 N/A <br /> Z Yes ❑No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or wig be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.