Laserfiche WebLink
D. Results of Testing/Servicing a r�-=,tl <br /> C" <br /> tl- 2' it (0A ILZdT %:s. <br /> RE <br /> Software Version Installed: 120.02 <br /> SEP 2 S 2017 <br /> Complete the following checklist: <br /> ❑X Yes ❑ No* Is the audiblealann operational? _nt%nonryll,,li,1--stidTAL HLA <br /> 0 yes ❑No* Is the visual alarm operational'? 0 EPARTMUIT <br /> ❑X Yes ❑No* Were all sensors visually inspected,functionally tested,and confirmed operational. <br /> ❑X Yes ❑No* Were all sensors installed at lowestpoint of secondary containment and positioned so that other equipment <br /> will not interfere with their <br /> ro r o ration? <br /> ❑ Yes ❑No* If alarms are relayed to a remote monitoring station, is all communications equipment(e.g.modem) <br /> ❑X N/A operational'? <br /> ❑X Yes ❑ No* Fur pressurized piping systems, does the turbine automatically shut down if the piping secondary <br /> ❑N/A containment monitoring system detects a leak,fails to operate,or is electrically disconnected?Ifyes:which <br /> sensors initiate positive shut-down?(Check all that apply) <br /> ❑X Sump/Trench Sensors; ❑X Dispenser Containment Sensors. Did you confirm positive shut-down <br /> due to leaks and sensor failure/disconnection? <br /> 0 Yes; ❑N o. <br /> ❑ Yes ❑No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no <br /> mechanical overfill prevention valve is installed),is the overfill waming alarm visible and audible at the <br /> 0 N/A tank fill point(s)and operating properly?If so,at what percent of tank capacity does the alarm trigger? <br /> oda <br /> Dyes* ❑X No Was any monuoirng equipment replaced? II'\CS.idem( specific sensors,probes. or othu equipment <br /> replaced and Inst the manufacturer name and model Iter all replacement parts iii 1)cction I-..(clow. <br /> F❑Yes* ❑X No Was liquid found inside any secondary containment systems designed as dry systems`? (Check all that <br /> ul Ny) ❑Product: ❑Water.If yes.describe causes in Section F. belrnv. <br /> ❑X 1"e; ❑ No* Was monitonn�- s stem set-up re\'ieviced to ensurV proper settings? Attach et up reports,if applicable <br /> 0 yeti ❑No~ [s all monitoring equipment operational per manufacturer's speei i1CaLIonS? <br /> *In Section E below,describe how and when these deficiencies were orwill be corrected. <br /> E. Comments: <br /> L 11 Waste Oil tank Overfill sensor 794390-420: Certified. <br /> L 12 Hydraulic Tank Gauge sensor 794380-208: Certified. <br /> L14 Motor Oil Annular 794390-420: Certified. <br /> L15 Vent Sump 794380-208: Certified. <br /> L16 Waste Oil drain pan. 794380-208: Certified. <br /> Both the Unleaded UST and the Diesel UST are equipped with mechanical overfill prevention valves. <br />