Laserfiche WebLink
SWRCB,January 2002 <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION Facili ID: PGE095 <br /> Client Name: Pacific Gas and Electric Company Date of Testing: 11/22/2016 <br /> Facility Address: 4040 West Ln. City: Stockton State: CA Zip Code: 95204 <br /> Facility Contact: Alex Steele Phone: 209-337-8902 ❑ Initial I❑Repair Test <br /> Date Local Agency Was Notified of Testing: 11/08/2016 ❑ 6 Month ❑Other <br /> Name of Local Agency Inspector(if present during testing): None Q Triennial <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: TAIT Environmental Services <br /> Technician Conducting Test: Jerry Sanouvong <br /> Credentials: [E CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester Q ICC UST Service Technician <br /> License Type: A B ASB C-10 HAZ License Number: 588098 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> 1 CC 8061056 4/5/2018 <br /> Incon level 4 1016583708 10/21/2017 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Unleaded Sump ❑X ❑ ❑ ❑ Unleaded 2 UDC ❑X ❑ ❑ ❑ <br /> Unleaded Secondary ❑x ❑ ❑ ❑ Diesel UDC ❑X ❑ ❑ ❑ <br /> Unleaded Annular ❑x ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Diesel Sump ❑X ❑ ❑ ❑ ❑ ❑ ❑ I ❑ <br /> Diesel Secondary ❑X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Diesel Annular ❑x ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Vent Sump ❑X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Waste Oil Sump ❑X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Waste Oil Secondary ❑X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Waste Oil Vent ❑X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Waste Oil Annular ❑X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Unleaded 1 UDC ❑X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> All test water was left on site <br /> For any equipment capable of generating a print out of test results,you must attach a copy of the test report to this certification. <br /> ❑X System printout attached. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: % 5osel Date: 11/22/2016 <br />