My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2005-2008.PDF
QuestysFileName
COMPLIANCE INFO 2005-2008
QuestysRecordDate
5/24/2018 4:59:31 PM
QuestysRecordID
3904191
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page ,Q of, <br /> 5. SECONDARY PIPE TESTING• — <br /> Test Method Developed By: ❑Piping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution:0 to 15"psi <br /> Piping Run# 2 Piping Run#,S9 Piping Run# Piping Run# <br /> Piping Material: /Ae';' w Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: .--- <br /> Piping Diameter: 3 ^ _ <br /> Length of Piping Run: <br /> Product Stored: �jaSr Lvvc� <br /> Method and location of <br /> i in -run isolation: <br /> Wait time between applying <br /> pressurelvacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: <br /> Test Start Time: 7" <br /> ` 0 0 <br /> Initial Reading(RD: 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: /-? `O c') <br /> Final Reading(RF): �$ PSI PSI PSI PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RO: PSI PSI PSI PSI <br /> Pass/Fail Threshold or Zero Zero Zero Zero <br /> Criteria: <br /> A "ass ❑ Fad Pass ❑Fail Pass El Fail ❑ -Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended fallow-up for failed tests) <br /> Arco #9600 <br /> 1250 N Wilson Way <br /> Stockton, CA. 95205 <br /> N05114 — SB 989 Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.