Laserfiche WebLink
I . I Page of <br /> • 6. PIPING SUMP TESTING • <br /> Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Wayne Perry Inc. Equipment Resolution: .0007" <br /> Sump# �7 Sump# % Sump# / Sump# <br /> Sump Diameter. <br /> Sump Depth: <br /> Sump Material: ?1,<.,f <br /> Height from Tank Top to Top of „ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 1� Z <br /> Electrical Penetration: G� <br /> Condition of sump prior to testing: �C�' �— <br /> Portion of Sump Tested' 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST 2"ABOVE HIGHEST <br /> PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION PIPING PENETRATION <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> product and water)?` <br /> Turbine shutdown response time NA NA NA <br /> Is system programmed for fail-safe ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> shutdown?` <br /> Was fail-safeverified to be <br /> operational?. ❑Yes ❑No ®NA ElYes ❑No ®NA ❑Yes ❑No ®NA ❑Yes ❑No ®NA <br /> Wait time between applying <br /> pressurelvacuum/water and starting 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> test: <br /> Test Start Time: ell j�f 63 <br /> Initial Reading(R): l XI J 3 jL�B <br /> Test End Time: ;/aJA'S Gj /j <br /> Final Reading(RF): 005:9Yp$J Xv <br /> Test Duration: 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min 15 Min <br /> Change in Reading(RFRO: (leve'-o aree 13 4r"03/ <br /> Pass/Fail Threshold or Criteria: -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 -0.0020 <br /> Test Result: Pass ❑ Fail N Pass ❑Fail J L Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑ Yes ❑No ❑NA ❑ Ycs ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑Yes ❑No ❑NA I ❑ Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Arco #9600 <br /> 1250 N Wilson Way <br /> Stockton, CA. 95205 <br /> N05114 — SB 989 Testing <br />