My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> SWRCB,January 2002 Page 3 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: U Piping Manufacturer XI Industry Standard U Professional Engineer <br /> U Other(Sped) <br /> Test Method Used: I$Pressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: pressure cracres Equipment Resolution: <br /> Plping Run# 1 Tr <br /> g Run# 3 Piping Run# <br /> Piping Material: Fiberglass rglass <br /> Piping Manufacturer: Ameron on <br /> Piping Diameter: n „Length of Piping Run: 120 ' 0 'Product Stored: Re per <br /> Method and location of Tr o 0 0 <br /> piping-run isolation: box to pipe s mp (SAME) (SAME) <br /> Wait time between applying <br /> pressure/vacuum/waterand hr. z h . hr. <br /> startingtest: r <br /> Test Stan Time: 10:4 5 10:45 10:45 <br /> Initial Reading(R,): PSI <br /> Test End Time: 11 :45 11 :45 11 :45 <br /> Final Reading(R,): 4.5 PSI 4. 5 PSI 4 . 5 PSI <br /> Test Duration: 1 hr. <br /> Change in Reading(RrR,): 0 0 0 <br /> Pass/Fail Thresholdor <br /> Criteria: 0 Loss 0 boss 0 Loss <br /> Test Result: R Pau U Fall M Pass U Fall Pass U Fall I U Pass U FaU <br /> C0mmeats— (include information on repaima made priors tefting,and recommendedfollow-up forfaiied tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.