Laserfiche WebLink
SWRCB,January 2002 • /V lA • Page 4 of 8 <br /> I <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: U Piping Manufacturer U Industry Standard U Professional Engineer <br /> U Other(Sped) <br /> Test Method Used: U Pressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run q Piping Run N Piping Run# Piping Run N <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of <br /> piping-run isolation: <br /> Wail time between applying <br /> pressure/vacuum/watcr and <br /> starling lest: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(Rr): <br /> Test Duration: <br /> Change in Reading(R,-R,): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Teat Result: u Pass u Fell U Pau U Fall U Pau U Fall U Pass U Fall <br /> C01"MeSts- (include information on repairs.plade priorra raftingand recornmemled(allow tp forfailed tests) <br />