My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j P. do-Tank Gauging 1 SITZ Equipment: C.Mheck this box if tank gauging is used only for inventory control. <br /> J Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank ganging equipment is used to perform leak detection monitoring. <br /> --qempiete the folio ' checklist: <br /> it Yes ❑ No* Has all mpa wmg been inspected for prpypreaiiyy andterannanon,including testing for ground faults? <br /> Yes 0 No* Were all tank gauging probes vis nspected for damage and residue buildup? <br /> O Yes Q No* Was aeCiaacy of system uct level readings tested? <br /> Q Yes ❑ No* I Was accuracy level readings tested? <br /> Q Yes Q No* Were es reinstalled properly? <br /> Q Yes 0-No- all items on the equipment manufacturer's maintenance checklist completed? <br /> * =ineLeak <br /> below,describe how and when these deficiencies went or wfir be corrected.Getectors aJb)-. Q Check this box if LLDs are not installed" <br /> C tete the folio cheeldist: <br /> Yes 7 NO For eejrdpmetu start-up or annual equipment catifiation, was a leak simulated to verify LLD performance? <br /> NIA (Check all that apply) Simulated leak rate: �3 g p.h.: 12 0.1 g p.b: O 0.2 g_p.h. <br /> eA Yes O No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> R Yes i3 No* Was the tesung apparatus properly calibrated? <br /> Ok Yes ❑ No* For mechawcai LLD,,does the LLD resrdet pmducrflow dit detects a leak? <br /> I Q NIA <br /> t -Ye-s- 17 No* For electronic LLDs.does the turbine aummaticalty'shut off if the LLD detects a leak? " <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LlDs,does the turbine automatically shat off if any portion of the monitoring system is disabled <br /> M NtA m discormected? <br /> D Yes Q No* For electronie LLDs,does rbc turbine automatically shat off if any potion of We monitoring system malfunctions <br /> Q N(_A, or fails a test? <br /> B Yes Q No* For electronic LLDs,have all access ble wivng corrections been viam ly inspected? <br /> I NIA <br /> Q Yes 10 No* I Were all items on ft equipmentmatmlacutrer s maintenance checklist completed? <br /> *In the Section R,below,describe how and when these deficiencies were or wit he corrected. <br /> H. Comtnents• -- �-: el <br /> L n (�s 3 CV end <br /> Page3a13 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.