My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 500 SERIE#TALLATION INSTRUCTIONS <br /> 3. Mounting Shear Valve Cabling & Bracket <br /> It is strongly recommended that this step be done before dispensers are placed on the island. <br /> Locate shear valve cabling brackets, shear valves and shear valve mounting plates. The shear <br /> valve cabling brackets should be mounted between the shear valve and the shear valve mounting <br /> plates. Locate the appropriate length shear valve actuator cable (connected to the 500S Shear <br /> Valve Actuator) and insert the cable loop end into the shear valve cabling bracket (shown <br /> below). The bracket will position the loop at the end of the cabling just below the actuator arm. <br /> Locate the bag containing both the split ring pliers and split rings (one per shear valve). Use the <br /> split ring pliers to insert the split ring onto the loop at the end of the actuator cable. Next, insert <br /> the split ring into the hole located on the OPW shear valve actuator arm. After the ring is <br /> mounted, reset the OPW shear valve to the position shown below. <br /> Reset Procedure <br /> The cabling is fully extended when the OPW shear valve actuator arm is located as shown <br /> below. When a fuel leak causes the 500S Shear Valve Actuator to pull the shear valve cabling <br /> and trip the shear valve, it must be reset. To reset,pull on any shear valve cable approximately <br /> %z" in the direction shown below. This will reset all shear valve cables and allow all shear valves <br /> trip arms to be reset. If any shear valve trip arm is not able to be reset, attempt to pull out the <br /> cable in question. If it cannot be reset, contact Customer Service at 1-800-739-4435. <br /> Split Ring —► <br /> Connector Reset cable after tripping <br /> shear valve by pulling <br /> any of the cables approx. <br /> u 1l2" indirection shownwn- <br /> - <br /> this will allow all shear <br /> ® valves to be reset. <br /> Shear Valve <br /> Cable Bracket <br /> Shear Valve <br /> Actuator <br /> Cabling <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.