Laserfiche WebLink
Page 3 of 8 OR/ <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 13 Piping Manufacturer Q Industry Standard ❑ Professional Engineer <br /> Ll Other(Specify) <br /> Test Method Used: IRI Pressure ❑Vacuum t] Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Unknown Unknown Unknown <br /> Piping Diameter: 4" 4" 4" <br /> Length of Piping Run: 75' 75' 60' <br /> Product Stored: Gas Gas Diesel <br /> Method and location of piping- Sump Sump Sump <br /> run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 minutes 5 minutes 5 minutes <br /> starting test: <br /> Test Start Time: 01:30 PM 02:30 PM 01:45 PM <br /> Initial Reading(Ri): 5 psi 0 5 psi <br /> Test End Time: 02:30 PM ------ 02:45 PM <br /> Final Reading(RF): 5 psi ------ 5 psi <br /> Test Duration: 1 hour 1 hour <br /> Change in Reading(RF-Ri): 0 ------ 0 <br /> Pass/Fail Threshold or Criteria: 0 ------ 0 <br /> Test Result: ❑O Pass ❑ Fail O Pass ❑+ Fail O Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Needs new 2" Piping boots in Regular 2 sump and dispenser 7/8. <br />