Laserfiche WebLink
FP/C <br /> Page 4 of 8 ., <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: U Sump Manufacturer © Industry Standard âť‘Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: U Pressure U Vacuum O Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: <br /> Sump i Sump 2 Sump 3 Sump <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: <br /> Sump Material: F.G F.G F.G <br /> Height from Tank Top to Top of 11" 11" 12" <br /> Highest Pip ng Penetration: <br /> Height from Tank Top to Lowest 4" 4" 4" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested2"over 2nd Piping <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and ISI Yes U No O NA ®Yes U No U NA O Yes U No U NA U Yes U No U NA <br /> water)T <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe IM Yes O No U NA ® Yes O No U NA ©Yes U No U NA U Yes U No U NA <br /> shutdown?' <br /> Was fail-safe verified to be ISI Yes U No U NA ®Yes U No U NA ® Yes O No U NA O Yes O No DNA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 minutes 5 minutes 5 minutes <br /> test: <br /> Test Start Time: 03:30 PM ----- 03:00 PM <br /> Initial Reading(Ri): ------ ------- 0.0025 <br /> Test End Time: 03:45 PM ------ 03:30 PM <br /> Final Reading(RF): ----- ----- 0.0025 <br /> Test Duration: ----- ----- 1/2 hour <br /> Change in Reading(Rr-Ri): ----- ------- 0 <br /> Pass/Fail Threshold or Criteria: 1/16" hr 1/16" hr 1/16" hr <br /> Test Result: U Pass IHI Fail U Pass 0 Fail O Pass U Fail U Pass U Fail <br /> Was sensor removed for testing? I@ Yes U No U NA O Yes U No U NA O Yes U No U NA U Yes U No U NA <br /> Was sensor properly replaced after IM Yes O No O NA O Yes U No O NA ©Yes U No U NA O Yes U No U NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Sump 1 & 2 need Electric Boxes Sealed. <br /> Sump 2needs new 2nd Piping Boot. <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />