My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:03:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\707\PR0505151\COMPLIANCE INFO 2006 - 2012 .PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2012
QuestysRecordDate
7/19/2016 8:32:58 PM
QuestysRecordID
3145718
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM - Healy Phas*..,:VR System-VR-201-A (CAS-9961) y Page 16 <br /> INSTALLATION INSTRUCTIONS for <br /> HEALY SYSTEMS, INC. <br /> CLEAN AIR SEPARATOR <br /> The Model 9942, Healy Systems Clean Air Separator Installation consists of a 400 gallon steel tank <br /> assembly (9961) that contains a fuel resistant bladder to contain excess gasoline vapors that may <br /> develop in gasoline storage tanks during idle periods of gasoline dispensing facility operation. The <br /> tank assembly weighs approximately 800 pounds which makes it necessary to have a power <br /> assisted lifting device available at the installation site to remove the tank from the transportation <br /> vehicle and place it on the required concrete pad (see drawing B9900-9945). The pad (level within <br /> 1/8"!foot) is located within 100 feet to the storage tank vent lines. The pad is a requirement of this <br /> installation. DO NOT PLACE THE TANK DIRECTLY ON THE GROUND OR ASPHALT SURFACE. <br /> NOTICE: The installer is responsible to ensure that the installation meets the latest edition <br /> requirements of NFPA 30A, Chapter 10. No electrical connections are required. The tank <br /> securement method shown in drawing B9900-9945 shall be approved by the local authority having <br /> jurisdiction with respect to wind and seismic loading. <br /> In addition to the tank, there is a hardware kit that contains the following: <br /> 1 Pressure/Vacuum vent valve (See Exhibit 1 of VR-201-A for model number) <br /> 4 Locking 1" NPT Ball Valves <br /> 4 Pad locks (keyed alike) <br /> 1 Breather Assembly, Healy Model 9948 <br /> 1 Vapor Inlet Assembly, Healy Model 9956 <br /> 1 Float Check Valve Assembly, Model 9466G <br /> Reference the appropriate Healy Systems installation drawing (C9900-9942, C9900-9971, C9900- <br /> 9972 or C9900-9973 of this manual) for placement of the above parts for the vent stack <br /> configuration required by the local Authority Having Jurisdiction (AHJ) for the UST system. The <br /> local contractor is responsible to provide all necessary, galvanized piping, non-hardening, UL <br /> classified pipe joint compound and plumbing fittings. Additional Pressure/Vacuum (PN) vent valves <br /> to complete installation are not included in the hardware kit. Healy is not responsible for the <br /> warranty of any other PN vent valve purchased to complete installation. <br /> The tank arrives at the site assembled and tested. All plumbing should be done using 1" galvanized <br /> steel pipe (Schedule 40) and approved nipples, as called out in the installation drawing appropriate <br /> for the site installation. Mounting hardware should be galvanized or stainless steel. Careful <br /> attention must be paid to the installation drawing appropriate for the site installation to assure proper <br /> operation of the bladder system. Do not inflate the bladder assembly after installation. <br /> it is important that the tank be secured to the concrete pad as shown in drawing B9900-9945 of this <br /> manual to prevent any unintentional repositioning of the tank as the connecting plumbing to the vent <br /> system is accomplished. <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax::603.882.5189 <br /> Healy Systems, Inc. —the innovative leader or Stage 11 vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.