My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:03:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\707\PR0505151\COMPLIANCE INFO 2006 - 2012 .PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2012
QuestysRecordDate
7/19/2016 8:32:58 PM
QuestysRecordID
3145718
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM - Healy Pha%WEVR System -VR-201-A (CAS -9961) �./ Page 17 <br /> OPERATION AND PURGING <br /> NORMAL OPERATION: <br /> ❑ There are four ball valves on the tank. In normal operation, only the valve at the top of the <br /> tank shall be open - the other three valves shall be closed. All four valves shall be locked in <br /> the above positions. The two plugs should be installed using a non-hardening, UL classified <br /> pipe joint compound and tightened to 60 ft-lbs- <br /> DRAINING THE BLADDER: <br /> ❑ An inspection of the need to drain the bladder is easily made by removing the plug at the tee <br /> on the bottom plumbing of the tank - be sure to have a metal container available to catch <br /> fluid. With the plug removed and the container in place, carefully open the ball valve above <br /> the tee to release any liquid. Any liquid coming over from the vent system would have <br /> collected above the valve in the riser pipe before going into the bladder. If liquid in excess of <br /> 16 ounces drains out, the bladder should also be drained. Use caution as the storage tanks <br /> could be pressurized. <br /> ❑ Should it be necessary to drain the bladder: <br /> 1. Close the upper ball valve (usually open) leading to the tank vent lines. <br /> 2. Open the valve that goes to the vertical riser that enters the top of the tank (the one <br /> without the ball valve going into the tank). Be sure the other three ball valves that <br /> connect to the vent lines and tank are closed. <br /> 3. Remove the plug from the bottom tee and connect an explosion proof evacuation <br /> pump capable of handling liquid. Have a liquid tight, metal container to receive any <br /> fluid that may exit the system and start the pump. If no liquid return within 30 seconds, <br /> the bladder is dry - discontinue pumping, remove the pump, replace the plug and <br /> return the ball valves to their original, locked, positions. <br /> DRAINING THE TANK: <br /> ❑ Should it be necessary to drain the tank (between the bladder and steel wall): <br /> 1 . Close the ball valve at the top of the tank and also the two valves on the vertical risers. <br /> 2. Remove the plug in the bottom tee and place a metal container below the pipe <br /> opening. <br /> 3. Carefully open the ball valve at the bottom of the tank - observe that the container that <br /> is being drained into does not overflow - empty container as required until fluid no <br /> longer comes from the pipe when the valve is open. <br /> 4. Close the ball valve and replace the plug into the tee. <br /> 5. Return all ball valves to their original locked positions. <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax: 603.882.5189 <br /> Healy Systems, Inc. —the innovative leader of Stage 11 vapor recovery equipment <br />
The URL can be used to link to this page
Your browser does not support the video tag.