Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: 2s� zu <br /> Complete the following cheeklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> Gllf es ❑ No* Is the visual alarm operational? <br /> Id"Yes ❑ No* Were all sensors visually inspected,functionally tested,and confirmedoperational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> GrN/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) Orlump/Treneh Sensors; 3 Dispenser Containment Sensors. <br /> Did ou confirm positive shutdown due to leaks and sensor failure/disconnection? 2rVes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> O"R/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s)and operating o 1 ? If so,at what percent of tank capacity does the alarm trigger? % <br /> ❑ Yes* No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section I?,below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> Product; ❑Water. If yes.describe causes in Section E,below. <br /> EFVes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ❑ Yes Or o* Is all monitoring ui trent operational at manufacturer's s cifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: Ai-e- 3 .t3 k L Ti 5 n N 7 H iE- 1(4 b",TZa <br /> P¢rc ,�a 7—,s<¢ 3yyh /aPsl L�aK 1 <br /> Page 2 of 3 0"1 <br />