Laserfiche WebLink
F. In-Tank Ganging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the following checklist: <br /> C3'Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Er Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Ef Yes ❑ No* Was accuracy of system product level readings tested? <br /> EF—Ye% ❑ No* Was accuracy of system water level readings tested? <br /> EY Yes ❑ No* Were all probes reinstalled properly? <br /> QFVes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: C3''T`g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ Nom�* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> O N/A <br /> ❑ Yes ❑ Nom* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 9-N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> fu N/A or faits a test? <br /> ❑ Yes ❑ * For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> U N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: /4 6 < 3 L z-- 0 t Ei+e L412 <br /> Page 3 of 3 03101 <br />