My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:03:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\707\PR0505151\COMPLIANCE INFO 2006 - 2012 .PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2012
QuestysRecordDate
7/19/2016 8:32:58 PM
QuestysRecordID
3145718
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Ganging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com tete the following checklist: <br /> C3'Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> Er Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Ef Yes ❑ No* Was accuracy of system product level readings tested? <br /> EF—Ye% ❑ No* Was accuracy of system water level readings tested? <br /> EY Yes ❑ No* Were all probes reinstalled properly? <br /> QFVes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the following checklist: <br /> Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: C3''T`g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ Nom�* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> O N/A <br /> ❑ Yes ❑ Nom* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 9-N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> fu N/A or faits a test? <br /> ❑ Yes ❑ * For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> U N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: /4 6 < 3 L z-- 0 t Ei+e L412 <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.