Laserfiche WebLink
w. ,r <br /> SWRCB,January 2002 Page_of <br /> 7. UNDER-DISPENSER CONTAINM T UDC TESTING <br /> Test Method Developed By: 'UDC Manufacturer , lndustry Standard I]Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum ydrostatic <br /> Other(Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> UDC UDC <br /> UDC UDC# <br /> UDC Manufacturer: / ve - <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to TOP e 1 <br /> of Highest Piping Penetration: 6 <br /> Height from UDC Bottom to ¢ p rt <br /> est cal Penetration: <br /> Condition of UDC prior to <br /> testin <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detectsliquid(both No NA Yes . ,No INA :Yes INo ! INA ❑Yes I1No INA <br /> roduct and water? <br /> Turbine shutdown response time <br /> Is system programmed forfeit- es ' .No NA Yes No ''NA - Yes No ''NA ( <br /> 'Yes � N -INA <br /> safe shutdown? <br /> Was fail-safe verified to he Yes 0 NA Yes No NA Yes l No NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startingtest <br /> Test Start Time: CIO <br /> Initial Readin R <br /> Test End Time: <br /> Final Readin RF : <br /> Test Duration: <br /> Chane in Readin RF-R : <br /> Pass(Fail Threshold or Criteria:Was sensor remov ed for testing? es No ' SNA - Yes No ' 'NA f`.Yes 'NoINAWas sensor properly replaced and es No ' iNA Yes No .NA Yes ' INo :;NA <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> /71 .ercce� � o has f/aa-t—� rrtcl C �.Q rns <br /> of d ekvf ZE d <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(')is"NO"or"NA",the entire UDC must be tested. (See SW RCB LG-160) <br />