Laserfiche WebLink
S W RCR,January 2002 Page of_ <br /> 5. SECONDARY PIPE YESTING <br /> Test Method Developed By: -Piping Manufacturer VTIndustry Standard i.!Professional Engineer <br /> her(Spec) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec) <br /> Test ui ment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: LA (,q At <br /> Piping Diameter: t! 0 t <br /> Length of Piping Run: 2S < <br /> Product Stored: /es p <br /> Method and location ofOo t Nb' OOT f N <br /> piping-run isoia ton--_._ _. - S(A <br /> Wait time between applying <br /> pressure/vacuum/water and Al <br /> starting test: <br /> Test Stan Time: O O rd <br /> Initial Reading(Ri): <br /> Test End Time: JO .( (3o <br /> Final Reading(RF): P9 <br /> Test Duration: hi r <br /> Change in Reading(RF-Rj): Ic— 8 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> AW O FOR d4M 0 F#A- 0 Pala O Fail 0 Ng H <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />