My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:03:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\707\PR0505151\COMPLIANCE INFO 2006 - 2012 .PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2012
QuestysRecordDate
7/19/2016 8:32:58 PM
QuestysRecordID
3145718
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S W RCR,January 2002 Page of_ <br /> 5. SECONDARY PIPE YESTING <br /> Test Method Developed By: -Piping Manufacturer VTIndustry Standard i.!Professional Engineer <br /> her(Spec) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec) <br /> Test ui ment Used: Equipment Resolution: <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: LA (,q At <br /> Piping Diameter: t! 0 t <br /> Length of Piping Run: 2S < <br /> Product Stored: /es p <br /> Method and location ofOo t Nb' OOT f N <br /> piping-run isoia ton--_._ _. - S(A <br /> Wait time between applying <br /> pressure/vacuum/water and Al <br /> starting test: <br /> Test Stan Time: O O rd <br /> Initial Reading(Ri): <br /> Test End Time: JO .( (3o <br /> Final Reading(RF): P9 <br /> Test Duration: hi r <br /> Change in Reading(RF-Rj): Ic— 8 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> AW O FOR d4M 0 F#A- 0 Pala O Fail 0 Ng H <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.