Laserfiche WebLink
page of <br /> SWRCB,January 2042 <br /> 5. SECQNllARY PIPE TESTING <br /> �J Test Method I7e�aloped By: pipingIndustry standard X Professional Engineer <br /> Other Spec ) <br /> Test Method UseX Pressure Vacuum Hydrostt�c <br /> d: <br /> Other(Spew <br /> Equipment Resolution: <br /> Test Lquipment Used:NITROGEN <br /> Piping Run#1 piping Run#2 Piping Run#3 Piping Run 0 4 <br /> FRP FRP FRP <br /> Piping Material: S�.R <br /> Piping Manufacturer: SMrM SWTg <br /> Piping Diameter; <br /> 3"OVER 2" 3"()VER 2" 3"DYER 2" <br /> Length of Piping Run: PREMIUM PLUS <br /> Product Stored: UNLEADED <br /> Method and location of sumps UDC's SUMP11OUDC's SUMP'SIUDC's <br /> i in -run isolation- <br /> Wait time between apPlYing 30 min 30 min 30min <br /> pressure vacuumlwater and 30 min <br /> starting test: 9:00 AM 9:00 AM <br /> Test Start Time: 4:00 AM <br /> 5 psi <br /> 5 psi 5 psi S psi <br /> initial Reading(Rj): 14:00 AM <br /> Test End Time: 10:00 AM 10.00 AM <br /> Final Reading(Re): 5 PSI 5 PSI 5 PSI <br /> 1 hr 1 hr <br /> Test Duration: 1 hr I hr <br /> Change in Reading[RF-W: <br /> 0 0 0 <br /> Pass/Fail Threshold or .5 psi .5 psi .5 psi .5 psi <br /> GYiteria. <br /> Test Result. X Pass 0 hail X Pass 0 Fail x Pass 0 Fail C3 Pass ❑Fa' <br /> Comments—Lkiclude itr ormation an re ins made prior to testing,aild recommended allow-u nr ailed—10-1 <br />