My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FLAG CITY
>
14931
>
2300 - Underground Storage Tank Program
>
PR0506221
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2021 2:21:44 PM
Creation date
11/8/2018 10:21:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506221
PE
2361
FACILITY_ID
FA0007287
FACILITY_NAME
LODI OIL INC ARCO #83680
STREET_NUMBER
14931
Direction
N
STREET_NAME
FLAG CITY
STREET_TYPE
BLVD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
14931 N FLAG CITY BLVD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\F\FLAG CITY\14931\PR0506221\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
8/10/2016 11:53:37 PM
QuestysRecordID
3164257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
page of <br /> SWRCB,January 2042 <br /> 5. SECQNllARY PIPE TESTING <br /> �J Test Method I7e�aloped By: pipingIndustry standard X Professional Engineer <br /> Other Spec ) <br /> Test Method UseX Pressure Vacuum Hydrostt�c <br /> d: <br /> Other(Spew <br /> Equipment Resolution: <br /> Test Lquipment Used:NITROGEN <br /> Piping Run#1 piping Run#2 Piping Run#3 Piping Run 0 4 <br /> FRP FRP FRP <br /> Piping Material: S�.R <br /> Piping Manufacturer: SMrM SWTg <br /> Piping Diameter; <br /> 3"OVER 2" 3"()VER 2" 3"DYER 2" <br /> Length of Piping Run: PREMIUM PLUS <br /> Product Stored: UNLEADED <br /> Method and location of sumps UDC's SUMP11OUDC's SUMP'SIUDC's <br /> i in -run isolation- <br /> Wait time between apPlYing 30 min 30 min 30min <br /> pressure vacuumlwater and 30 min <br /> starting test: 9:00 AM 9:00 AM <br /> Test Start Time: 4:00 AM <br /> 5 psi <br /> 5 psi 5 psi S psi <br /> initial Reading(Rj): 14:00 AM <br /> Test End Time: 10:00 AM 10.00 AM <br /> Final Reading(Re): 5 PSI 5 PSI 5 PSI <br /> 1 hr 1 hr <br /> Test Duration: 1 hr I hr <br /> Change in Reading[RF-W: <br /> 0 0 0 <br /> Pass/Fail Threshold or .5 psi .5 psi .5 psi .5 psi <br /> GYiteria. <br /> Test Result. X Pass 0 hail X Pass 0 Fail x Pass 0 Fail C3 Pass ❑Fa' <br /> Comments—Lkiclude itr ormation an re ins made prior to testing,aild recommended allow-u nr ailed—10-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.