My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FLAG CITY
>
14931
>
2300 - Underground Storage Tank Program
>
PR0506221
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2021 2:21:44 PM
Creation date
11/8/2018 10:21:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506221
PE
2361
FACILITY_ID
FA0007287
FACILITY_NAME
LODI OIL INC ARCO #83680
STREET_NUMBER
14931
Direction
N
STREET_NAME
FLAG CITY
STREET_TYPE
BLVD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
14931 N FLAG CITY BLVD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\F\FLAG CITY\14931\PR0506221\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
8/10/2016 11:53:37 PM
QuestysRecordID
3164257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br /> SW1tCB,January 2402 <br /> 5. PIPING SUMP TF,Sx'TNG x Professional Engineer Manufacturer Industry Standard <br /> Test Method Developed By: p <br /> Other(SPectfS'} vacuum X Hydrostatic <br /> Test Method Used: Pressure <br /> {Specify] <br /> 'list Equipment Used:WCON TS-STS Other Equipment Resolution:g� #4 <br /> Sump# 187 Sump# 2,91 Sump# 3 89 p <br /> 42" 42" 42" <br /> Sump Diameter: 72" <br /> Sump Depth: FRP FRP FRP <br /> Sump Material: <br /> Height from Tank Top to Top of 170 34" 1 <br /> Hi est p' panetration: 31�� 32" <br /> Height from Tank Top to 'Lowest 30" <br /> Electrical Penetradom CLEAN/DRY <br /> i CLEANiDRY <br /> Condition of sump prior to testing: CLEANlDRY <br /> Portion of Sump Tested' 34 <br /> 38" 36" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X Yes ❑No 0 NA X Yes U No [;NA X Yes ❑No ❑NA <br /> roduct and water?` 15S 15 see <br /> Turbine shutdown response time 15 sec <br /> Is system programmed for fail-safe X Yes r]No U NA X Yes ❑No CNA X Yes :7 No f]NA <br /> shutdown?` XAMYes LINO ❑ <br /> Was fail-safe verified to be X Yes [3 No ❑NA XYes : No 0 NA NA <br /> a eratiaa�al?' <br /> Wait tune between applying, 30 mixt 30 min <br /> pressumlvacuumlwater and starting 30 min <br /> test. 8:45 am 8:45 am <br /> Test Start Time: 8:45 am <br /> 3.6713 3.5418 5.4012 <br /> Initial Reading W 9:00 am <br /> Time:End me: 9:00 am 9:00 am <br /> 3.6715 3.5414 5.4010 <br /> Final Reading(Rg): 15 min <br /> Test Duration: i5 min 15 min <br /> .�,00� .0004 .0402 <br /> Change in Reading(RF-B*: .002 <br /> PasslFail Threshold or Criteria: .002 .002Test Result: x Pass 0 Pail X Pass ❑Fail X Pass ❑Fail Cl Pass ❑Fail <br /> Was sensor removed for testing? X Yes ❑No C]NA X Yes '-'No ❑NA X Yes t]No CNA C]Yes C]No it NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes LINO U NA X Yes ❑No CNA o Yes ❑No ❑NA <br /> verifsed functional after testin ? <br /> Comments_ nc&*information on rMairs made prior to testin and recommendedfollow-u or failed tests <br /> 0 =If the entire depth of the sump is not tested specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested.. (See SWRCB LGi-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.