Laserfiche WebLink
--) June 2007, February 2008, and April 2008 monthly inspection reports for the <br />Manteca facility were not found on site at the time of the May 8, 2008, routine UST <br />inspection. <br />Title 23, CCR 2715 (f) Designated operator: employee training. By July 1, 2005, <br />and every twelve months thereafter, the designated UST operator(s) shall train facility <br />employees for which he or she is responsible in the proper operation and maintenance <br />of the underground storage tank system. For facility employees hired on or after July 1, <br />2005, the initial training shall be conducted within 30 days of the date of hire. <br />(1) The training for facility employees must include, but is not limited to: <br />(A) The operation of the underground storage tank system in a manner consistent <br />with the facility's best management practices. <br />(B) The facility employee's role with regard to the monitoring equipment as specified <br />in the facility's monitoring plan. <br />(C) The facility employee's role with regard to spills and overfills as specified in the <br />facility's response plan. <br />(D) The name of the contact person(s) for emergencies and monitoring equipment <br />alarms. <br />(2) At least one of the facility employees present during operating hours shall have <br />current training in accordance with subdivision (f)(1). For facilities that are not <br />routinely staffed, the designated UST operator shall implement a facility employee <br />training program approved by the local agency. <br />(3) A list of facility employees who have been trained by the designated UST operator(s), <br />shall be maintained on-site or off-site at a readily available location, if approved by <br />the local agency. The list shall be provided to the local agency upon request. The list <br />shall include the dates of training for all facility employees, and the hiring dates for all <br />facility employees hired on or after July 1, 2005. <br />4 Employee training records for the Manteca facility were not found on site at the <br />time of the November 21, 2005, March 9, 2007, and May 8, 2008, routine UST <br />inspections. <br />4 Employee training records for the Tracy facility were not found on site at the <br />time of the December 30, 2005, routine UST inspection, and the March 7, 2006, <br />reinspection. <br />V. ATTACHMENTS <br />Attachment 1 - April 13, 2004, monitoring system certification test report for Tracy facility <br />Attachment 2 - September 8, 2004, spill container test report for Tracy facility <br />Attachment 3 - October 19, 2004, routine UST inspection report for Tracy facility <br />Attachment 4 - October 19, 2004, routine hazardous waste inspection report for Tracy <br />facility <br />Attachment 5 - February 17, 2005, follow up letter to October 19, 2004, routine <br />hazardous waste inspection report for Tracy facility <br />Attachment 6 - HWTS EPA ID Profile for Tracy facility <br />Attachment 7 - Permit application, SR0043328, for EVR phase 1 upgrade <br />Attachment 8 - December 30, 2005,routine UST inspection report for Tracy facility <br />Attachment 9 - December 30, 2005, monitoring system certification test report for Tracy <br />facility <br />19 <br />