Laserfiche WebLink
Page 2 of 3 <br /> 1. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> Other(Specify) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run N 87 <br /> Piping Material: Plastic <br /> Piping Manufacturer: Flex <br /> Piping Diameter: 2" <br /> Length of Piping Run: Approx 200' <br /> Product Stored: 87 prod <br /> Method and location of Test boot in sump Test boot in sump Test boot in sump Test boot in sump <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 8:00am <br /> Initial Reading(R): 5 psi <br /> Test End Time: 10:15am <br /> Final Reading(RF): 5 psi <br /> Test Duration: 2.25 hours <br /> Change in Reading(RF-R): 0 <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> 87 sec line—replaced broken clamp on Jumper Boot in UDC 5/6 <br />