Laserfiche WebLink
y Page 3 of 3 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer N Indus Standar <br /> Industry d ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum <br /> ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures. Equipment Resolution: <br /> UDC#5/6 <br /> UDC Manufacturer: — <br /> UDC Material: Plastic <br /> UDC Depth: 30" <br /> Height from UDC Bottom to Top 10" <br /> of Highest Pi ing Penetration: <br /> Height from UDC Bottom to 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: Fair <br /> Portion of UDC Tested Above highest Above highest Above highest Above highest <br /> netration enetration neVetfon netration <br /> Does turbine shut down when <br /> UDC sensor detectsliquid(both F]Yes ❑No N NA ❑Yes E]No N NA E]yes E]No N NA E]yes El ®NA <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?. ❑Yes ❑No N NA ❑Yes❑No N NA ❑Yes ❑No N NA ❑Yes ❑No N NA <br /> Was fail-safe verified to be <br /> operational?* ❑Yes ❑No N NA ❑Yes❑No N NA ❑Yes ❑No N NA ❑Yes ❑No N NA <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 9:08am <br /> Initial Reading(R,): 2.3330 <br /> Test End Time: 9:23am <br /> Final Reading(RF): 23332 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Chane in Reading(RF-R,): 0.00022 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: N Pass Fail Ll Pass ElFail LlPass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? NYes ❑No❑NA I NYes❑No[-INA NYes❑No[I NA Oyes ONO❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes ❑No L]NA NYes❑No❑NA NYes❑No ElNA NYes❑No 1:1NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> UDC 5/6—replaced broken clamp on jumper boot 87 prod <br /> t If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />