My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 4:48:12 PM
Creation date
11/8/2018 10:21:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2006-2012.PDF
QuestysFileName
COMPLIANCE INFO 2006-2012
QuestysRecordDate
7/5/2017 10:08:33 PM
QuestysRecordID
3482644
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM—Executive 01wers VR-201-D and VR-202-D (CAS—9961) Page 21 <br /> INSTALLATION INSTRUCTIONS for <br /> HEALY SYSTEMS, INC. <br /> CLEAN AIR SEPARATOR <br /> The Model 9961 or 9961H, Healy Systems Clean Air Separator (CAS) consists of a 400 gallon steel <br /> vapor processor vessel that contains a fuel resistant bladder to hold excess gasoline vapors that may <br /> develop in gasoline storage tanks during idle periods of gasoline dispensing facility operation. Models <br /> and Drawings with a "H" suffix apply to horizontal CAS installations and those without a "H" suffix apply <br /> to vertical CAS installations. The CAS assembly weighs approximately 800 pounds which makes it <br /> necessary to have a power assisted lifting device available at the installation site to remove the CAS <br /> from the transportation vehicle and place it on the required concrete pad (see drawing 9900-9945 <br /> or 9900-9945H). The pad (level within 1/8"/foot) is located within 100 feet to the gasoline storage <br /> tank vent lines. The pad is a requirement of this installation. DO NOT PLACE THE CLEAN AIR <br /> SEPARATOR DIRECTLY ON THE GROUND OR ASPHALT SURFACE. NOTICE: The installer is <br /> responsible to ensure that the installation meets the latest edition requirements of NFPA 30A, Chapter <br /> 10. No electrical connections are required. The CAS securement method shown in drawing 9900-9945 <br /> or 9900-9945H shall be approved by the local authority having jurisdiction with respect to wind and <br /> seismic loading. Installer shall not loosen, rotate or remove factory installed fittings or flange as this <br /> may damage factory seals and void warranty. <br /> In addition to the vapor processor vessel, there is a hardware kit that contains the following: <br /> 4 Locking 1" NPT Ball Valves <br /> 4 Pad locks (keyed alike) <br /> 1 Breather Assembly, Healy Model 9948 <br /> 1 Float Check Valve Assembly, Model 9466G <br /> Reference the appropriate Healy Systems installation drawing (9900-9942, 9900-9942H, 9900-9971, <br /> 9900-9971 H, 9900-9972, 9900-9972H, 9900-9973 or 9900-9973H of this manual) for placement of the <br /> above parts for the vent stack configuration required by the local Authority Having Jurisdiction (AHJ) <br /> for the Underground Storage Tank (UST) system. The local contractor is responsible to provide all <br /> necessary, galvanized piping, non-hardening, UL classified pipe joint compound and plumbing fittings. <br /> Additional Pressure/Vacuum (PN) vent valves to complete installation are not included in the hardware <br /> kit. Healy is not responsible for the warranty of any other PN vent valve purchased to complete <br /> installation. <br /> The CAS arrives at the site assembled and tested. All plumbing shall be done using 1" galvanized <br /> steel pipe (Schedule 40) and approved nipples, as called out in the installation drawing appropriate for <br /> the site installation. Mounting hardware shall be galvanized or stainless steel. Careful attention must <br /> be paid to the installation drawing appropriate for the site installation to assure proper operation of the <br /> bladder system. Do not inflate the bladder assembly after installation. <br /> It is important that the CAS be secured to the concrete pad as shown in drawing 9900-9945 or <br /> 9900-9945H of this manual to prevent any unintentional repositioning of the CAS as the connecting <br /> plumbing to the vent system is accomplished. <br /> Franklin Fueling Systems Website: htto.//wvmfranklinfueling.com <br /> 3760 Marsh Road Email: sales@franklinfueling.com <br /> Madison, Wisconsin 53718 USA Telephone: 800-225-9787 <br /> ARB Approved Installation, Operation and Maintenance Manual �Q Fax: 608-838-6433 <br /> *Franklin FuelingSystem`s <br />
The URL can be used to link to this page
Your browser does not support the video tag.