My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 4:48:12 PM
Creation date
11/8/2018 10:21:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2006-2012.PDF
QuestysFileName
COMPLIANCE INFO 2006-2012
QuestysRecordDate
7/5/2017 10:08:33 PM
QuestysRecordID
3482644
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 9 <br /> 2. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ® Industry Standard ❑Professional Engineer <br /> Other(Specify) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run#87 Piping Run#91 Piping Run #V7R Piping Run#Syphon <br /> Piping Material: Plastic Plastic Fiberglass Fiberglass <br /> Piping Manufacturer: Flex Flex Smith Smith <br /> Piping Diameter: 2" 3" 2" 4" <br /> Length of Piping Run: Approx 200' Approx 200' Approx 200' Approx 10' <br /> Product Stored: 87 prod 91 prod Vapor return/vent 87 syphon <br /> Method and location of Test boot in sump Test boot in sump Test boot in sump Test boot in sump <br /> piping-ran isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 8:30am 8:15am 8:30am 8:30am <br /> Initial Reading(R,): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 8:35am 9:15am 9:30am 9:30am <br /> Final Reading(RF): 0 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(Rt-R,): -5 psi 0 0 0 <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: ❑ Pass ®Fail I ® Pass ❑ Fail ® Pass ❑Fail ® Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for jailed tests) <br /> 87—lost 5 psi in approx 5 minutes—Found leak at Jumper Boot in UDC 5/6 <br /> Rain&Wind <br />
The URL can be used to link to this page
Your browser does not support the video tag.