Laserfiche WebLink
Page 4 of 9 <br /> 3. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Sump#87-1 Sump# 87-2 Sump # 91 Sump # <br /> Sump Diameter: 48" 48" 48" <br /> Sump Depth: 54" 55" 60" <br /> Sump Material&Manufacturer: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 28" 19" 14" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 19" 19" 20" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Fair Fair Fair <br /> Portion of Sum Tested' Above highest Above highest Above highest Above highest <br /> Sump penetration penetration penetration penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe ❑hes No NA <br /> shutdown? ❑ ® ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> Was fail-safe verified to be ❑Yes❑No®NA ❑Yes❑No®NA [-]Yes❑No®NA ❑Yes❑No®NA <br /> o erational9* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 11:40am 12:22am 12:58am <br /> Initial Reading(Rj): 4.3806 2.1912 2.7643 <br /> Test End Time: 11:55am 12:37pm 1:lpm <br /> Final Reading(Rr): 4.3816 2.1904 2.7644 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-RI): 0.00098 0.00078 0.00016 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: ®Pass ❑Fail ® Pass ❑Fail. ® Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> Was sensor properly replaced and <br /> verified functional after testing? ®Yes❑No❑NA ®Yes El No❑NA ®Yes❑No El NA ®Yes El No El NA <br /> Comments—(include information on repairs made prior to resting, and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />