Laserfiche WebLink
Page 8 of 9 <br /> 9.\ ALL/OVERFILL CONTAINMENT B(>-.AS <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure Vacuum ®Hydrostatic <br /> ❑ Other(Spec) _ <br /> Test Equipment Used: See attached lesting procedures Equipment Resolution: <br /> Spill Box# R7-1 Fill Spill Box ft 87-2 Fill Spill Box#91 Fill Spill Box <br /> Bucket Diameter&Brand: 12" 12" 12" <br /> Bucket Depth: 13.5" 13.5" 13.5" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: 9:34am 9:34am 9:34am <br /> Initial Reading(RI): 1.5155 1.6536 2.5366 <br /> Test End Time: 9:49am 9:49am 9:49am <br /> Final Reading(RF): 1.5161 1.6538 2.5370 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-Rt): 0.00060 0.00014 0.00036 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass (-]Fail ® Pass [-] Fail ❑ Pass ❑Fail <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> Rain <br />