Laserfiche WebLink
Page 3 of 10 <br /> E: 11CM <br /> 2. SECONDARY PIPE TESTING <br /> FIF off-- <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> Other(Specify) $ 201 <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) ENVIRONMENT - <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run#87-A Piping Run#87-B Piping Run#91-A Piping Run#91-B <br /> Piping Material: Plastic Plastic Plastic Plastic <br /> Piping Manufacturer: Flex Flex Flex Flex <br /> Piping Diameter: 2" 2" 2" 2" <br /> Length of Piping Run: Approx 150' Approx 150' Approx 150' Approx 150' <br /> Product Stored: 87 prod 87 prod 91 prod 91 prod <br /> Method and location of Test boot in sump Test boot in sump Test boot in sump Test boot in sump <br /> piping-run isolation: <br /> Wait time between applying 30 minutes 30 minutes 30 minutes 30 minutes <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: Visual Fail 10:57am 10:36am 10:36am <br /> Initial Reading(R,): 5 psi 5 psi 5 psi <br /> Test End Time: 11:57am 11:36am 11:36am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0.00 0.00 0.00 0.00 <br /> Criteria: <br /> Test Result: ❑ Pass ®Fail I ® Pass ❑Fail I ® Pass ❑Fail I ® Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 87-A failure—hole in jumper boot in UDC 5/6 <br />