Laserfiche WebLink
�.. ` Page 9 of 10 <br /> 9. SP1LL/OVERFELL CONTAINMENT BOXES <br /> QQ2=11 jr- <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill Bucket Manufacturer ® Industry Standard ❑Profes t <br /> ❑ Other(Specify) <br /> Test Method Used: El Pressure ❑Vacuum ❑ FDacrnjPw <br /> ®Other(Specify) 1 hour leak test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Spill Box# 87-1 Fill Spill Box# 87-2 Fill Spill Box#91 FID Spill Box#Additive <br /> Fill <br /> Bucket Diameter&Brand: 12" 12" 12" 12" <br /> Bucket Depth: 14" 13'/2" 14" 16" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> starting test: <br /> Test Start Time: 11:01am 11:01am 11:01am 11:17am <br /> Initial Reading(Rt): 11 '/s" 113/8" 11'/4" 13'/2" <br /> Test End Time: 12:01pm 12:01pm 12:01pm 12:17pm <br /> Final Reading(RF): 11 '/2" 113/8" 11'/4" 13'/2" <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or 0.002 0.002 0.002 0.002 <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ® Pass ❑Fail ® Pass ❑ Fail ® Pass ❑Fail <br /> COMMeRtS—(include information on repairs made prior to testing,and recommended follow-up forfaded tests) <br />