My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 4:34:29 PM
Creation date
11/8/2018 10:21:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2013-2015.PDF
QuestysFileName
COMPLIANCE INFO 2013-2015
QuestysRecordDate
7/5/2017 11:14:25 PM
QuestysRecordID
3483232
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> FacilityNamc� COSTC00658 <br /> Facility Address: 3250 W-Graadlne Datc: 3/18/1015 <br /> Rd <br /> City:Tracy Zip Code: 95377 <br /> Designated UST Operator Conducting the Inspection: Gabrld BLrtfa <br /> international Code Council Certification q: 8260320 Expiration Date: 6/5/2016 <br /> Signature. Phone: (949)460-5200 <br /> Y-Yrs,N-Nq NA—Not Appacabit <br /> Item MONITORING PANEL/ALARI1f HISTORY <br /> Y N NA <br /> I Monitoring System is powered on and in proper operating mode X <br /> 2 Monitoring system is not currently showing any alarms or warnings X <br /> 3 Alarm history re log for the previous month is available,and has been reviewed by the Designated UST X <br /> Operator. (Attach a copy of the alarm history report/log to this form if available.) <br /> 4 Each alarm for the previous month has been responded to appropriately X <br /> 5 Sensors located in hank-top containment sumps have riot alarmed in the past month, X <br /> Sa - List all tank-top sumps where alarms occurred in the past month. <br /> /r'Ofe .4taepr%hers an alarm has occurred m the parr mond,cowl be impecled nmess a goahftrd service technician responded lo,and properly <br /> addressed rhe cause of the alarm.Attach documemanon rerfiaig appropriate senwe to this report if sump uupeenon is required.recon)msula <br /> in item 6,be/aa <br /> UST SYSTEM INSPECTION <br /> 6 Tank-top containment sumps are free of water,debris,and hazardous substance. Sensors are located properly. <br /> ,gorc1"nW,mreMon ofruyano^N rrgrvrcdin tveyuwMrr an alarm her xawrtdm Ar iTonih <br /> pay for rhirh ar.ruroun,rr nroN <br /> N <br /> Sump LOCQ(i0a: "'" '�+ Sump Location: "'s *,*. <br /> Sump Location: K'^ i SumpLocmion: VA u <br /> Sump Location: 'c'^ Sump Locotiom <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> Y N NA Y N NA <br /> TQnk-87N X Tank-91 X <br /> Tank-87S XI Tank-Additive Tank X <br /> 8 Under-dispenser Com.tnmem areas are frce of wafer,debris,and hazardous substance. Sensors are located properly <br /> V N NA V N NA <br /> Dispenser-112 IX I I I Dispenser-9/10 X <br /> Dispenser-3/4 _ _ X Dispenser-//.'12 <br /> X <br /> Di.cpenser3/6 7 f <br /> Dispenser-7-B 1C <br /> PAPERWORK INSPECTION Y N NA DATE DONE <br /> 9 Monitoring system certification has been completed within past 12 months. X 925/14 <br /> 10 Secondary containment tests have been complaed within the required timeframe. X sins <br /> 11 Spill containment structure(bucket)testing was completed within the past year, X 9125114 <br /> 12 Tank tighisam testing was complcccd within required timeframe. X N/A <br /> 13 line tightness testing was completed within required timeframe. X N/A <br /> 14 Other required testing/maintenanec was completed within required timeframe.(List test/maintenancc items below) <br /> Test/Afamtenance: X WA <br /> Tedb'Mamlenance: X N/A <br /> '1'esuMrriwenance: X WA <br /> FACILITY EMPLOYEE TRAINING Y N NA <br /> 15 All facility employees have received the required on-the-job training within the past year X <br /> 16 1 All facility employees hued within the past 30 days have received the required on-Ihe-job vainiag. X <br /> Note: Aoy answer of"N"should be explained is the comment section on the following page,and will require follow-up <br /> action. <br /> Page I oft <br />
The URL can be used to link to this page
Your browser does not support the video tag.