Laserfiche WebLink
Comments: <br /> 4) Q3:Premium PLLD Shutdown due to Gross Line Fad on 2/12/15 See attached work order. QI: <br /> Unleaded 87A, Q2: I;nleaded 87B and Q3: Premium PLLD Shutdowns due to Gross Line Fails on <br /> 3/18/15. See attached worked <br /> 15) Jason Thompson was trained on 3/18/15, See attached training roster. <br /> 16) Jason*1hompson was trained on 3/18/15. See attached training roster <br /> Items Requiring Follow-Up Actions: <br /> 10) Test contained failing componentsSite is awaiting repairs and retesting. <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated UST Operator, who possesses <br /> a current "California UST System Operator" certification issued by the lntemational Code Council <br /> A copy of this monthly visual Inspection checklist must be provided to the UST Owner or Operator, but not to <br /> the State Water Resources Control Board. The UST Operator must alert the UST Owner or Operator of any <br /> condition discovered during the monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months. The records must be maintained on-site or, if approved by the local <br /> agency,off-site at a readily available location <br /> Page 2 of 2 <br />