My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 4:34:29 PM
Creation date
11/8/2018 10:21:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2013-2015.PDF
QuestysFileName
COMPLIANCE INFO 2013-2015
QuestysRecordDate
7/5/2017 11:14:25 PM
QuestysRecordID
3483232
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DECEIVE <br /> JUN 0 8 2015 <br /> 5. SECONDARY PIPE TESTING ENVIRONMENTAL <br /> Test Method Developed By: ❑Piping Manufacturer ❑✓ Industry Standard ❑Professiona Engineer - <br /> ❑Other(Specify) <br /> Test Method Used: 2]Pressure ❑vacuum ❑Hydrostatic <br /> El Other(Spec) <br /> Test Equipment Used: Equipment Resolution: PSI <br /> Piping Run#87a Piping Ran# Piping Run# Piping Run# <br /> Piping Material: Plastic <br /> Piping Manufacturer: Flex <br /> Piping Diameter: 2" <br /> Length of Piping Run: Appx 150' <br /> Product Stored: Gas 87 <br /> Method and location of <br /> piping-run isolation: Test boot in sump <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes <br /> starting test: <br /> Test Start Time: 9:30am <br /> Initial Reading(R,): 5 PSI PSI PSI PSI <br /> Test End Time: 10:30am <br /> Final Reading(Rr): 5 PSI PSI PSI PSI <br /> Test Duration: 1 hr <br /> Change in Reading(RSR,): 0 <br /> Pass/Fail Threshold or 0.00 <br /> Criteria: <br /> Test Result: ❑Pass ❑Fall ❑Pass ❑Fail []Pass []Fan ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Repairs made pursuant to San Joaquin County EH Permit SR0071768 <br /> Inspector Michelle Henry present during testing <br /> 6 Month post repair test required - due by 11/27/15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.