Laserfiche WebLink
RECEIVEL <br /> JUN 08 2015 <br /> 7. UNDER-DISPENSER CONTAINMENT (UDQ TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard ❑Pf40M OWW NTA I <br /> ❑Other(Specify) v •T..j n�qn oru Ce�� <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: Inches <br /> UDC# 1/2 UDC# 5/6 UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: Plastic Plastic <br /> UDC Depth: 35" 30" <br /> Height from UDC Bottom to Top 8" 8" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Fair Fair <br /> testis <br /> Portion of UDC Tested 2"above highest Penetration 2"above highest penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N/A N/A <br /> product and water <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- <br /> safe shutdown? ❑Yes ElNo m NA ❑Yes ❑No m NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be ❑Yes ❑No p NA ❑Yes ❑No p NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes <br /> starting test <br /> Test Start Time: 10:41am 10:21 am <br /> Initial Reading (Rt): 1.2819 Inches 4.2807 Inches Inches Inches <br /> Test End Time: 10:56am 10:36am <br /> Final Reading(R,): 1.2823 Inches 4.2808 Inches Inches Inches <br /> Test Duration: 15 min 15 min <br /> Chane in Reading(R,-R,): 0.0004 0.0001 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 <br /> Test Result: p Pass ❑Fail p Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ®Yes ❑No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA []Yes ❑No ❑NA <br /> Was sensor properly replaced and m Yes ❑No ❑NA m Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Repairs made pursuant to San Joaquin County EH Permit SR0071768 <br /> Inspector Michelle Henry present during testing <br /> 6 Month post repair test required - due by 11/27/15 <br />