Laserfiche WebLink
SWRCB,January 2602 Page—of <br /> Secondary Containment Testing Report Form <br /> This form is intended for rise by contractors perforating periodic testing of UST secondary containment systems. Use the appropriate <br /> pages of this form to report results for all components tested. The completed forth, switten test procedures, and printouts from tests <br /> (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1, FACILITY INFORMATION <br /> Facility Name: Costco Wholesale-TRACY-0658 1 Date of Testing:6/6/2016 <br /> Facility Address: 3250 W.GRANTLINE RD,TRACY,CA 95377 <br /> Facility Contact: Wierderholt,Michael Phone:(209)834-1247 <br /> Date Local Agency Was Notified of Testing; 5/20/2016 _ <br /> Name of Local Agency Inspector(ifpresent during testing); �... •.- <br /> 2. TESTING CONTRACTOR INFORMATION JUN 2 �. <br /> Company Name:Belshire Environmental Services,Inc. <br /> Technician Conducting Test:Saul Gonzalez , <br /> Credentials: ® CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester .' - <br /> License Type: A-General Engineering Contractor License Number:808313 <br /> Manufacturer Tr:tirrin <br /> Manufacturer Component(s) Date Training Expires <br /> See Attached <br /> 3, SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs ComponentPass Pall Not Repairs <br /> Tested Made Tested Made <br /> Tank Annulars ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pie ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 1 u ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Fill Sum ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Spill Bucket ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests; <br /> 0 Placed in drums left on site for proper disposition. <br /> Transported to next site for use In additional testing. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of»ry knowledge, the facts stated in this document airy accurate and in full compliance with legal requirements <br /> r <br /> T � - <br /> Technician's Signature; - o Date: 6/6/2016 <br /> JUN 2016 <br />