Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> 'fest Method Developed By: ❑ Piping Manufacturer ® Industry Standard © Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum p Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Test reducer boots,air•:compressoe and gauges 1 quiptuent Resolution:0.5%of span <br /> 87SI 87 Manifold V-RlVcnt <br /> Piping Material: Fiberglass Plastic Fiberglass <br /> Piping Manufacturer: AO Smith Environ AO Smith <br /> Piping Diameter: 3" 2" 4++ <br /> Length of Piping Run: 15' 15' 240' <br /> Product Stored: 87 87 NA <br /> Method and location of <br /> piping-run isolation: Reducer BootslFittiugs Reducer BootslFittings Reducer Boots/Fittings <br /> Wait tithe between applying <br /> press urelvacuumhvater and 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 08:30 AM 08:30 AM 08:30 AM <br /> Initial Reading(R): 5 5 5 <br /> Test End Time: 09:30 AM 09:30 AM 09:30 AM <br /> Final Reading(Ry): 5 5 5 <br /> Test Duration: 60 Min 60 Min 60 Min <br /> Change in Reading(Rr-will): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: No Detectable Loss No Detectable Loss No Detectable Loss <br /> Test Result: Pass Pass Pass <br /> Comments—(ii?cltide ii?far)natioi7.oi7 i-epairs i7?ade pi•lor to testi?ag, ai7d i-ecoiyiuierrded folloti,-tip for failed tests) �T <br /> OCT 2 6 2017 <br /> PERMITISERVICES <br />