Laserfiche WebLink
9. SPILL/0VE VILL CONTAINMENT BOXES <br /> Facility is No(Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Contalnment Boxes are present,but were Not Tested ❑ <br /> Test Method Developed By: ❑ Spill_Bucket.Manufacturer M Industry Standard ❑ Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: C1 Pressure ❑ Vacuum ®Hydrostatic <br /> p Oilier-{Speed>) <br /> Test Equipment.Used: Incon TS-STS Sump Test System Equipment Resolution: +/-0.002" <br /> -M 4. <br /> Spill Box# 91 -FB Spill.Boa# 91 -VB Spill Bos# Additive G Spilt BOx#Additive <br /> Bucket Diameter; 12" 12" 12" 12" <br /> Bucket Depth: 11" 11" 11" 11" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 06:12 AM 06:12 AM 07:44 AM 07:44 AM <br /> Initial Reading(Ri); 3.8575 2.8955 3.8101 1.6398 <br /> Test End Time: 06:27 AM 06;27 AM 07:59 AM 07:59 AM <br /> Final Reading(RF):. 3.8578 2.8951 3.8099 1.6394 <br /> Test Duration; 15 min. 15 min. 15 min. 15 min. <br /> Change iri Reading(RFS R,): 1 0.0003 -0.0004 -0.0002 -0,0004 <br /> Pass/Fail Threshold or <br /> Criteria: +l-0.002" +/-0.002" +l-0.002" +l-0.002" <br /> Test'Result: Pass Pass Pass Pass <br /> Comments--(include info)-mation an r6pairs nraele prior to testiq, at��r1'ecaflrntended olla►�-irp for�faile�l tesi,$) <br /> o � <br /> OCT Z6 ZOV <br /> mnnDANMENTAL.HEALTH <br /> PERWISERVIGE <br />