My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 9:08:35 AM
Creation date
11/8/2018 10:21:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2016 - PRESENT.pdf
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE LOCATION::. <br /> r <br /> ! �, West Valley Mall Id, <br /> I <br /> in..uc.en <br /> Ad - y <br /> � <br /> VICINITY MAP' DSC <br /> VIRONMENTAL HEALTH <br /> FUELING <br /> DEPRRTMENT <br /> / (e)FILUVAPORSUMPS <br /> % (e)PRODUCT SUMPS� (IW.3eU10ESl <br /> (ttP SPtACES) _ <br /> I.ANNULAR SPACE) <br /> (fYP--S) <br /> )o <br /> `/0 67A ®•O` SCOPE OF WORK <br /> UDC REPAIR DISPENSER UDC 87 SECONDAR <br /> AILURES @DISPENSER#V2 AND#5/6 <br /> :NA <br /> ISCONNECT EXISTING ELECTRICAL <br /> le)w LASERS 2. MOVE DISPENSERS AND SET ASID <br /> RODUCT SECONDARY LINE FAI E <br /> tnau au INS LLDISPENSERS <br /> (e)VEEOERROOT a)I TALL(1)SECONDARY TBOOTS <br /> TLS S50 CONTROL j rO O� M EL#ISR 2.7)(2.7A IN PENSER#5/6 <br /> PANE <br /> (a)CONTROL _——J 4.UDC#12 YDROSTATIC FAI RE <br /> BUILDING a) INST L(4)IRF 862.5 ON ALL PRODUCT <br /> LINEIN DC#1/2 <br /> u b)INSTALL )IRF 8B .5M-ON VAPOR LINE IN <br /> (e)DIS ENSGRS(,W 6CIACES) Ie111EPLY TANK UDC#1/2 <br /> c)INSTALL(3) F 4B1.4M ON ALL CONDUITS <br /> IN UDC#1/2 <br /> 5.COORDINATE U TORY INSPECTIONS <br /> 6.PROVIDE FIN SB98 OST <br /> ❑� CONSTRUC N TESTI !SUBMIT <br /> FINAL RE LTS <br /> O O n O NOTE: <br /> �nl, ��/4 1.AL ORK TO BE DONE UN R THE ICC <br /> V 0 LI R AIR AND INSTALLATION RTIFICATION <br /> 2. L EQUIPMENT AND MATERIA INSTALLED <br /> HALL BE DONE BY A TRAINED D <br /> CERTIFIED TECH. <br /> 3.INSPECTION SHALL BE SET 72- <br /> HOURS IN ADVANCE <br /> ������lllt"'' <br /> C=REPAIR LOCATIONS <br /> REVISED 4-23-2015 <br /> COSyW COSTCO#658 <br /> NaEEM5VVi00LMWA" 325 W.GIANT LINE <br /> COSTCO TRACY,CA.95304 <br /> STORE =10 DATE: as-11-2015 PLOT PLAN DA Bii-98 X680 CE <br /> SCALE:AS NOTED PG 1 O <br /> (1 WAYNE PERRY INC. <br /> �IV17 fW ANE PERRY?AVON <br /> CQVSTRUCTION AND CONSULTING <br /> 8281 COMMONWEALTH AVE. <br /> BUENA PARK,CA 98821 <br /> (714)826-0352 FAX(714)5237880 <br />
The URL can be used to link to this page
Your browser does not support the video tag.