Laserfiche WebLink
SWRCB,January 2002 %up, *a/ Page_of <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: ❑Tank Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Dwyer Manometer Equipment Resolution: +/-20/6 <br /> Tank# Tank# Tank# Tank# <br /> Is Tank Exempt From Testing?' X Yes ❑No X Yes ❑No ❑Yes ❑No ❑Yes ❑No <br /> Tank Capacity: <br /> Tank Material: <br /> Tank Manufacturer: <br /> Product Stored: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rl): <br /> Test End Time: <br /> Final Reading(Rr): <br /> Test Duration: <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail 0 Pass ❑Fail <br /> Was sensor removed for testing? ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No (INA <br /> Was sensor properly replaced and Oyes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> Annular space is brine filled. <br /> Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> mvt:nn Wnlif. ;n l"nAn of Rn.vdafinnv T41n 91 CPnfinn 91.1'7/nVFll <br />