My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1987 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
244
>
2300 - Underground Storage Tank Program
>
PR0231137
>
COMPLIANCE INFO 1987 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 1:16:56 PM
Creation date
11/8/2018 10:22:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2007
RECORD_ID
PR0231137
PE
2361
FACILITY_ID
FA0001554
FACILITY_NAME
MIRACLE MILE MARKET
STREET_NUMBER
244
Direction
W
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13708014
CURRENT_STATUS
01
SITE_LOCATION
244 W HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HARDING\244\PR0231137\COMPLIANCE INFO 1987 - 2007 .PDF
QuestysFileName
COMPLIANCE INFO 1987 - 2007
QuestysRecordDate
7/21/2016 3:39:19 PM
QuestysRecordID
3146929
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 NW 'u/ Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 20' 30' <br /> Product Stored: Regular Regular <br /> Method and location of Test Boot Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Min 5 Min <br /> starting test: <br /> Test Start Time: 8:50 10:35 <br /> Initial Reading(RO: 5 PSI 5 PSI <br /> Test End Time: 9:20 11:05 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: 30 Min 30 Min <br /> Change in Reading(RF-R,): 0 0 <br /> Pass/Fail Threshold or 0 Drop 0 Drop <br /> Criteria: <br /> Test Result: a Pass ❑Fail a Pass ❑Fail ❑ Pass O Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Test boot on premium line was missing, installed a split test boot and tested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.