Laserfiche WebLink
GILBAR <br /> PR%OBE INSTALLATION INSTRUCTTO* =4-a j jb®r<:a <br /> IMPORTANT! <br /> DO NOT ATTEMPT TO WIRE A MAGNETOSTRICTIVE PROBE INTO A NEW EMC INSTALLATION BASED SOLELY <br /> ON THE INFORMATION CONTAINED IN THIS MANUAL THIS MANUAL CONTAINS INSTALLATION AND WIRING <br /> PROCEDURES FOR THE INSTALLATION OF ONLY A MAGNETOSTRICTIVE PROBE! <br /> FOR COMPLETE SYSTEM INSTALLATIONS, REFER TO THE APPLICABLE "SITE PREPARATION AND INSTALLA- <br /> TION INSTRUCTIONS" MANUAL PROVIDED WITH THE MONITORING SYSTEM. <br /> SECTION I. INTRODUCTION SECTION II. MAGNETOSTRICTIVE PROBE <br /> A. GENERAL INSTALLATION <br /> 1_ This manual contains procedures for the installation of <br /> magnetostrictive probes for underground storage tanks in antlt WARNING: TO PROTECT YOURSELF AND <br /> EMC Monitoring System designed and manufactured for OTHERS FROM BEING STRUCK BY VEIII- <br /> Gilbarco. This manual assumes all preliminary site prepara- CLES DURING WORK, BLOCK OFF YOUR <br /> tion is completed, and that field wiring from the monitor to WORK AREA DURING INSTALLATION <br /> the probe junction box is in place. AND SERVICE. <br /> If this is a new installation and site preparation is necessary, WARNING: TO AVOID ELECTRICAL <br /> refer to the appropriate Site Preparation and Installation SHOCK WHICH COULD KILL YOU, BE <br /> Instructions or contact your Gilbarco representative for SURE AC POWER TO THE TIS MONITOR <br /> assistance. IS OFF DURING INSTALLATION. <br /> 2. When a vertical bar I appears adjacent to text or illustra- <br /> tions, information has been added or changed at the last <br /> revision date. CAUTION: DO NOT INSTALL PROBE IN A <br /> . DAMAGE CLAIMS {�I, TANK'S FILL/DROP TUBE. FAILURE TO COM- <br /> DAMAGE WITH THIS CAUTION CAN RESULT IN <br /> 1. Thoroughly examine all components and units as soon as EQUIPMENT DAMAGE, INACCURATE INVEN- <br /> received. The magnetostrictive probe is a precision instru- TORY CONTROL, OR UNDETECTED POTEN- <br /> ment. Because internal damage sustained in transit may not TIAL ENVIRONMENTAL AND HEALTH HAZ- <br /> be visible, carefully inspect the exterior of the probe for ARDS. <br /> dents. A. TANK DIAMETER MEASUREMENT <br /> 0.1 NOTE: Insist that the carrier's agent verify the inspec- Perform the following procedure to ensure that probes are <br /> tion and sign the description. installed in the proper tanks (see Figure 1, "Tank Diameter <br /> Measurement"). Inaccurate readings will result if probes are <br /> 2. Immediately notify the delivering carrier of damage or not the correct length for the given tank diameter. <br /> loss. This notification may be given either in person or by <br /> telephone. Written confirmation must be mailed within 48 1. Measure the distance from the bottom of the tank to the <br /> hours. Railroads and motor carriers are understandably top of the probe riser pipe (a). <br /> reluctant to make adjustments for damaged merchandise 2. Measure the distance from the bottom of the probe riser <br /> unless inspected and reported promptly. pipe to the top of the probe riser pipe (b). <br /> 3. Risk of loss,or damage to merchandise remains with the 3. Subtract (b) from (a) to determine the correct tank <br /> buyer. It is the buyer's responsibility to file a claim with the diameter (c). <br /> carrier involved. <br /> 4. Make sure the probe Length (see Figure 2, "Magnetostri- <br /> 4. Immediately advise your Gilbarco representative,distribu- dive Probe Dimensions") is correct for the tank diameter. <br /> tor,or the factory so that we may assist you. CAUTION: INSTALLATION OF MAGNETO- <br /> C. RETURN SHIPPING. All shipments of Gilbarco I STRICTIVE PROBES IN MAGNETIZED RISER <br /> products must be prepaid. If the probe is damaged, return YYY PIPES WILL RESULT IN IMPROPER OPER- <br /> it in the original shipping container with shock absorbing ATION. FAILURE TO COMPLY WITH THIS <br /> material provided. Gilbarco will accept no liability for CAUTION CAN RESULT IN EQUIPMENT DAM- <br /> damage caused by improper packing. Address the shipment AGE, INACCURATE INVENTORY CONTROL, <br /> o Gilbarco Inc., 7300 West Friendly Ave., Greensboro,NC OR UNDETECTED POTENTIAL ENVIRONMEN- <br /> 7420 TAL AND HEALTH HAZARDS. <br /> 1 <br />