Laserfiche WebLink
SWRCB,January 2002 � IVEOF <br /> 6. PIPING SUMP lEC` <br /> TESTING ` ` v <br /> Test Method Developed By: D Sump Manufacturer D Industry Standard X Professional Engineer <br /> ❑Other(Sped) <br /> JAN 16:2015 <br /> Test Method Used: D Pressure D Vacuum tftbNMENTAL <br /> D Other(Spec) <br /> Test Equipment Used:Caldwell Level Change Indicator Equipment Resolution: .00 <br /> Sump#1-87 1Sump#2-91 Sump#3-Diesel Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 62" 61" 62" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 15„ 17" 15" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 19 V:" 19" 17" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' Water Line 21 %" Water Line 23" Water Line 21" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes Yes Yes <br /> productand water)? <br /> Turbine shutdown response time Not Alarmed Not Alarmed Not Alarmed <br /> Is system programmed for fail-safe Yes Yes Yes <br /> shutdown? <br /> Was fail-safe verified to be No No No <br /> operational?* <br /> Wait time between applying water 5 Minutes 5 Minutes 5 Minutes <br /> and startingtest: <br /> Test Start Time: 8:55 8:45 9:40 <br /> Initial Reading(R,): .001 .001 .001 <br /> Test End Time: 9:25 9:15 10:10 <br /> Final Reading(RF): .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass <br /> Was sensor removed for testing? Yes Yes Yes <br /> Was sensor properly replaced and �,eS Yes Yes <br /> verified functional after testing? <br /> Comments (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />