My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
1111
>
2300 - Underground Storage Tank Program
>
PR0506724
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:12:19 AM
Creation date
11/8/2018 10:22:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0506724
PE
2361
FACILITY_ID
FA0007594
FACILITY_NAME
WINE COUNTRY STATION/7-ELEVEN
STREET_NUMBER
1111
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04931056
CURRENT_STATUS
01
SITE_LOCATION
1111 E KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\K\KETTLEMAN\1111\PR0506724\COMPLIANCE INFO 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFO 2008 - 2015
QuestysRecordDate
6/27/2018 4:14:35 PM
QuestysRecordID
3926585
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> SWRCB,January 2002 Page_of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: DUDC Manufacturer D Industry Standard X Prof <br /> D Other(Specify) <br /> Test Method Used: D Pressure D Vacuum X Hydrostatic <br /> D Other(Specify) .IAN 16`2015 <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution:-0-N.-_ <br /> UDC# 1&2 UDC#3&4 UDC#5&6 MAW <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Coated Steel Coated Steel Coated Steel Coated Steel <br /> UDC Depth: 9" 9" 9" 9" <br /> Height from UDC Bottom to Top Enters From Bottom Enters From Bottom Enters From Bottom Enters From Bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Enters From Bottom Enters From Bottom Enters From Bottom Enters From Bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested Water Level 7" Water Level 7" Water Level 7" Water Level 7" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both No No No No <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A N/A N/A <br /> Is system programmed for fail- Yes Yes Yes Yes <br /> safe shutdown?* <br /> Was fail-safe verified to be No No No No <br /> o erational?* <br /> Wait time between applying 5 Minutes 5 Minutes 5 Minutes 5 minutes <br /> water and starting test <br /> Test Start Time: 10:40 10:50 11:00 11:10 <br /> Initial Reading(R,): .001 .001 .001 .001 <br /> Test End Time: 11:10 11:20 11:30 11:40 <br /> Final Reading(RF): .001 .001 .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes 30 Minutes 30 Minutes <br /> Change in Reading RF-R,): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes .005/30 Minutes .005/30 Minutes <br /> Test Result: Pass Pass Pass' Pass <br /> Was sensor removed for testing? No No No No <br /> Was sensor properly replaced and N/A N/A N/A N/A <br /> verified functional after testin ? <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for jailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SW RCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.