Laserfiche WebLink
UST SYSTEM DRAWING INFORMAVWOr- Mr-NMY PIYI%t-, <br /> 1. Three complete sets of plant (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 00TJniK IV kOnnA,N <br /> 5. Tank cross-sectional diagram. <br /> 6. Detail of tank, associated piping, excavation and cover. <br /> 7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) 8 26351 <br /> 8. Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br /> secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results;to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> WISTIN& TD QC�JY1�11fJ <br /> TANK # K 9 # 0 # <br /> CAPACITY —A 17 <br /> 14 N 1 <br /> MANUFACTURER <br /> COMPOSITION B <br /> MODEL PWDW-VNI" DoLae-WM <br /> UMSPOZy iow <br /> PRODUCT UN 5b <br /> CORROSION PROTECTION C.J <br /> U.L. LISTED EJ <br /> COMPATIBILITY WITH 100% Y � <br /> METHANOL I <br /> yej <br /> 13. TANK(s) 1 - <br /> /{fdg WK TWT 7Ci QLyy�F1iN <br /> A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metaLLic exterior <br /> ••coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> ry lei <br /> (2) Vacuum applied to interstitial space. <br /> X a. Fiberglass LX 10 P-Ov1AuN <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test)- <br /> C. Non-cLad steel tank [Section 2635 (a) (2) (A)1 <br /> Nk (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> O.j (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />