Laserfiche WebLink
AMERICAN EN.-tRONMENTAL MANAGEMENT Cos4PORATION <br /> Project Newark Sierra- Pipeline Closure Job No. 81051 Boring PL-3 Sheet 1 of 1 <br /> Date Started 7/5/90 at 1330 Completed 7/5/90 at 1400 Surface Elevation <br /> Total Depth 11.5 feet Location Next to pipeline on loading dock. <br /> Logged By Mike Stephens Drilled By B & F Drilling <br /> _ Remarks Drilled at 30°angle. SS = California Modified Split Spoon Sampler <br /> E F D F SAMPLE G L <br /> L E E E T N B P D R T R R O <br /> E E P E Y U L E E A I E A G <br /> V T T T P M O R P N P C P SAMPLE DESCRIPTION <br /> A H E B W T G O H <br /> T E S 6 H E V I <br /> I R E C <br /> 0 1 IN R <br /> N N Y <br /> 4"Asphalt,4"AB sand and gravel,very moist. <br /> 1 8"-5' VERY SILTY CLAY,some sand,soft,low to medium plasticity,very moist, <br /> brown, (CL). <br /> 2 <br /> 3 <br /> 5 5-7.5' Color changes to dark gray. <br /> 7 <br /> 7.5-9' SILTY CLAY,some sand,medium plasticity, moist, (CL). <br /> — 8 <br /> 9 9.11.5' CLAY,medium plasticity,slightly stiff, moist,some black mottling,light <br /> tan, (CL). <br /> to Tree root at 10'. <br /> c <br /> --It SS PL-3A H it- 0 40% <br /> x <br /> 12 <br /> End of boring. <br /> 13 <br /> 14 <br /> — 15 <br /> 16 <br /> 17 <br /> — 18 <br /> 19 <br /> ----20 <br /> 21 <br /> 22 <br /> L <br /> 23 <br /> 24 <br /> 25 <br /> �btrcv-09(ms151 <br />