Laserfiche WebLink
AMERICAN ENyrrRONMENTAL MANAGEMENT COrSPORATION <br /> Project Newark Sierra-Pipeline Closure Job No. 81051 Boring PL-4 Sheet 1 of 1 <br /> Date Started 7/5/90 at 1425 Completed 7/5/90 at 1450 Surface Elevation <br /> Total Depth 11.5 feet Location Next to pipeline on the loading dock. <br /> Logged By Mike Stephens Drilled By B & F Drilling <br /> _Remarks Drilled at a 300 angle. SS = California Modified Split Spoon Samoler <br /> E F D F SAMPLE G L <br /> L E E E T N B P D R T R R 0 <br /> E E P E Y U L E E A I E A G <br /> V T T T P M O R P N P C P SAMPLE DESCRIPTION <br /> A H E B W T G O H - <br /> T E S 6 H E v I <br /> I R E C <br /> 0 1 (it) R <br /> N N Y <br /> 6.5"of Asphalt,5"AS sand and gravel. <br /> __1 11.5"•2.5' SILTY CLAY, some sand,medium plasticity,moist,brown,(CL). <br /> — 2 v <br /> 2.5-8' SLIGHTLY SILTY CLAY,medium to high plasticity,slightly stiff,sticky, <br /> 3 moist,dark gray, (CL). <br /> — 5 <br /> 6 <br /> — 7 <br /> 8 8.115 SANDY CLAY stiff,slightly moist,light brown (10YR5/4),some black <br /> mottling (slight), (CL). <br /> — g <br /> 10 <br /> 9 <br /> C <br /> --it SS PL-4A i it• 0 700% <br /> 12 11.5' End of boring. <br /> — 13 <br /> — 14 <br /> 15 <br /> — 18 <br /> — 17 <br /> — 18 <br /> 79 <br /> — 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 6ine.au(ms�-5) <br />