Laserfiche WebLink
AMERICAN ENMONMENTAL MANAGEMENT CORPORATION <br /> Project Newark Sierra Job No. 81051 Boring PL-6 Sheet 1 of 1 <br /> Date Started 7/6/90 at 1320 Completed 7/6/90 at 1350 Surface Elevation <br /> Total Depth 11.5 feet Location Next to pipeline on loading dock <br /> Logged By Mike Stephens Drilled By B & F Drilling <br /> —Remarks Drilled at 300 angle SS = California Modified Split Spoon Sampler <br /> E F D F SAMPLE G L <br /> L E E E T N B P D R T R R O <br /> E E P E Y U L E E A I E A G <br /> V T T T P M O R P N P C P SAMPLE DESCRIPTION <br /> A H E B W T G O H <br /> T E S 6 H E v I <br /> I R E C <br /> O 1 (ft) R <br /> N N Y <br /> .p. <br /> 5.5-concrete,3-AB sand and gravel. <br /> — i 8.5'-2' FINE SANDY CLAY,very moist,brown,(CL). <br /> 1 — 2 2-7' CLAY,slight fine sands,sticky,moist,gray,slight petroleum odor, (CL/CH). <br /> --3 <br /> --5 <br /> 7 7-11.5' FINE SANDY CLAY,very silty,low plasticity,stiff,dry,brown(5YR4/4),(CL). <br /> — g <br /> — 10 <br /> a <br /> c <br /> --it SS PL-6A i it- 700 <br /> 11* <br /> ' <br /> 12 11.5' End of boring. <br /> 13 <br /> 14 <br /> --15 <br /> --16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 27 <br /> 22 <br /> --23 <br /> 24 <br /> — 25 <br /> Elncv-0o(ms3� <br />